When a standard unit does not fit your rig, your site or your fluid programme, we design one that does. Drawn, built and tested in our own workshop.

In-house engineering
Custom solutions
Available for sale and rental

Equipment built around your project

– Practical solutions, developed in-house –

Why choose custom engineering?

Your rig, site layout and schedule determine what you need from your equipment. You may need more storage capacity, a compact mixing system or a pumping unit that connects to your existing installation.

Our engineers start from your numbers: flow, pressure, volume, footprint, power on site. We then adapt an existing unit or develop a new design, with our engineers and workshop team working closely together throughout the build.

What you get

  • Project-specific design

    Sized for your rig, your fluid volume and your site, not for an average.

  • One supplier for the whole chain

    Engineering and manufacturing are all under one roof.

  • Proven components

    Custom does not mean experimental: we build with the same pumps, mixers and controls as our standard range.

  • Fits your existing fleet

    Couplings, connections and controls matched to what your crew already runs.

Drilling fluid storage unit

Our process, step by step

– From first call to a running unit on site –

  1. 1

    Consultation

    We go through your rig, fluid programme and site with you. Often on site, always with an engineer.

  2. 2

    Design and engineering

    3D model, production drawings and a fixed quote. You approve before we cut steel.

  3. 3

    Manufacturing

    Fabrication, assembly and electrical integration in Nijverdal, with photos along the way.

  4. 4

    Testing

    The complete unit runs on our test bench. Pumps, mixers and controls as one system.

  5. 5

    Delivery and commissioning

    We deliver, commission on site and train your crew. Support continues after that.

Engineer working on a 3D design of HDD equipment
Steel fabrication in the HDD Drilling Equipment workshop
Assembly of a MudForce mixing unit

Delivered solutions

Built in-houseMixing unit

MudForce 2500: mixing, storage and transfer in one unit

The MudForce 2500 brings together bentonite mixing, fluid storage and transfer in a single container unit. Its hopper and venturi system support efficient mixing, while the enclosed 18 m³ tank provides storage for prepared drilling fluid. With different equipment options available, the unit can be configured to suit your site setup and handling requirements.

  • Mixing capacity: 2500 L per batch
  • Transfer capacity: 1,500 L/min at 4 bar
  • Tank capacity: 18 m³
  • Handling: hook-lift and cable system
View the unit